Collaboration Diagram Loosing Numbers

  1. MyEclipse Archived
  2.  > 
  3. UML Development
Viewing 6 posts - 1 through 6 (of 6 total)
  • Author
    Posts
  • #265153 Reply

    magex
    Member

    I am having this problem on both MyEclipse 5.0.1 and 5.1 on Windows Server 2003

    I create a collaboration diagram, in it I put 3 Classifier roles and link them together by association lines. On these lines I add 2 messages “1: test1” and “2: test2” and the diagram is now the way I want it. After I close the UMR tab and reopen it, the number has all been reverted back to 1.

    This is reproducable when creating a new umr file is created or when adding a diagram to an existing one.

    #265197 Reply

    Riyad Kalla
    Member

    Thank you for the detailed example. I’m passing it onto someone from the UML team to look into.

    #265208 Reply

    Riyad Kalla
    Member

    Hmm I see a problem here, every time I add a message it’s labelled “1:”, it never increments… on the same association or on a different one.

    #265213 Reply

    Riyad Kalla
    Member

    Nevermind I was able to reproduce the issue, I have filed it as a bug. Thank you for the help finding this.

    #265229 Reply

    magex
    Member

    Another issue that I was having is that if you put your numbering system with major and minor number such as “1.1.1: someText” the 1.1.1 gets compressed down into an integer “1: someText”

    #265231 Reply

    Riyad Kalla
    Member

    Thank you, I added that additional note to our bug.

Viewing 6 posts - 1 through 6 (of 6 total)