Hi,
i can not figure out how to draw implementation relationships (1 class implements 2 interfaces). It was very easy for me to hover the mouse over a inteface and click on the hotspot to create a ‘implementation’ relationship between 1 interface and 1 class. However, i need this class to implement another interface as well. I tried to dran the relationship arrow from the interface to the class diagram, however, it does not join them. Can someone please show me the step-by-step instructions? Many thanks!!!